Home
Categories
EXPLORE
True Crime
Comedy
Society & Culture
Business
Sports
Health & Fitness
Technology
About Us
Contact Us
Copyright
© 2024 PodJoint
00:00 / 00:00
Podjoint Logo
US
Sign in

or

Don't have an account?
Sign up
Forgot password
https://is1-ssl.mzstatic.com/image/thumb/Podcasts116/v4/a2/0d/70/a20d70f3-0454-cc44-a0b0-f3e86de6520d/mza_3912500136084321005.jpg/600x600bb.jpg
Fire Ninja
Fireninja
81 episodes
5 days ago
An explanation of fire safety law, tips, guidance and advice to keep you safe from fire and prosecution
Show more...
Documentary
Society & Culture
RSS
All content for Fire Ninja is the property of Fireninja and is served directly from their servers with no modification, redirects, or rehosting. The podcast is not affiliated with or endorsed by Podjoint in any way.
An explanation of fire safety law, tips, guidance and advice to keep you safe from fire and prosecution
Show more...
Documentary
Society & Culture
Episodes (20/81)
Fire Ninja
National Association of Healthcare Fire Officers (N.A.H.F.O) Conference - 10th June 2025

This is a live recording from the 10th June 2025 at the National Association of Healthcare Fire Officers.


With guests Peter Aldridge

Jim Miller

and

Jak Ryan


You can join NAHFO at https://nahfo.org


This years event was sponsored by Birmingham Dogs Home

www.birminghamdogshome.org.uk

Show more...
2 months ago
31 minutes 32 seconds

Fire Ninja
Grenfell Phase 2 - Volume 2 - Part 3 - Chapter 24

This episode looks at Volume 2 Chapter 24 of the Grenfell Phase 2 Inquiry report specifically;


1. Celotex RS5000 Insulation

A. Introduction

B. Background

i. Key Personnel & Management

ii. The Acquisition by Saint Gobain

iii. Lambda Values

iv. The Change of Polyol

C. The Development of RS5000

i. Genesis of the "Above 18m Project": 2008 - 2012

ii. Allocation to Jonathan Roper: 2012 - 2013

iii. June 2013: Business Case

iv. Celotex's Investigations during 2013

v. Sotech and IFC: June - October 2013

vi. Discussions with BRE: May and October 2013

vii. The Roper-Evans Exchange: 1st November 2013

vii. 4th November 2013 Meeting - The 5 Options

viii. The Decision to Proceed

ix. Designing the Test

x. The First Test: 14th February 2014

xi. Reaction to the First Failed Test

xii. Decision to Restest

xiii. Design Changes

xiv. No New Drawings

xv. Source of Materials

xvi. The Second Test - May 2014

xvii. BRE's Knowledge of the Design Changes

xviii. Decisions Following the Second Test

xix. The Slide Show

xx. Instructions to Produce Slides "For General Business Use"

D. BRE Draft Report

i. Discussion of the Draft Report

ii. Decision not to Correct the Report

iii. Request to Remove Figure 18

iv. Internal Review and Issue of the Report

v. Mr Clark's Involvement in the BRE Test Report

vi. The RS5000 Classification Report

vii. The Abridged Report

viii. The Marketing of RS5000

ix. The RS5000 Marketing Literature

x. The Compliance Guide

xi. The Specification Guide

xii. Other Marketing Documents

xiii. Internal Launch of RS5000

E. Aftermath of the Launch

i. Relations with NHBC

ii. Problems in the Market

iii.LABC Approval

iv. Handover to Debbie Berger

v. Contact with BRE

vi. February 2015: Market Analysis Slideshow

vii. Desktop Study (March 2015)

viii. Exova's Draft Report

ix. NHBC's Reaction


Don't forget to visit www.fireninja.info and subscribe to the newsletter for a chance to win a VIP ticket to the Fire Safety Event 2025.

Show more...
7 months ago
1 hour 50 minutes 8 seconds

Fire Ninja
EWS1 Follow Up - With Matt Hodges-Long

A follow up episode looking at the last 2 weeks events regarding EWS1 forms and the reactions from industry and people affected.


If you are happy to share your story get in touch at Podcast@fireninja.info

www.fireninja.info


or you can email evidence to Matt via Help@BuildingSafetyRegister.co.uk


You can view the twitter/X conversation at the following link

https://x.com/RH_residents/status/1887822347278721196

Show more...
8 months ago
50 minutes 12 seconds

Fire Ninja
EWS Forms - Current Social Media Coverage - With Matt Hodges-Long & Gavin Skelly

This episode will look at the current claims surrounding Adam Kiziak of Tri Fire and Tri Fire themselves.


Matt Hodges-Long of The Building Safety Register and Trackmyrisks https://www.linkedin.com/in/matthodgeslong/


And


Gavin Skelly of Fire Aware https://www.linkedin.com/in/gavin-skelly-fciob-miconstm-afa-6126071b0/


Guest starred on this podcast. This is a developing story and as such may receive further edits.

Show more...
9 months ago
53 minutes 56 seconds

Fire Ninja
Grenfell Phase 2 - Volume 2 - Part 3 - Chapter 23

This episode looks at Volume 2 Chapter 23 of the Grenfell Phase 2 Inquiry report and does contain swearing specifically;


1. Certification of Kingspan K15 by LABC - Local Authority Building Control

A. Local Authority Building Control

B. LABC's Certification Schemes

C. The First Certificate for K15: May 2009 - May 2012

D. Mr Jones' Meeting with Kingspan in December 2008

E. Concerns Raised about the LABC Type Approval for K15

F. Later LABC Registered Details Certificates for K15


Don't forget to visit www.fireninja.info and subscribe to the newsletter for a chance to win a VIP ticket to the Fire Safety Event 2025.

Show more...
9 months ago
45 minutes 45 seconds

Fire Ninja
Grenfell Phase 2 - Volume 2 - Part 3 - Chapter 22

This episode looks at Volume 2 Chapter 22 of the Grenfell Phase 2 Inquiry report and does contain swearing specifically;


1. Kingspan K15 Insulation

A. The Use of K15 Insulation on Grenfell Tower

B. K15 - The Product

C. Early Marketing

D. Large Scale Testing: May 2005

E. Kingspan's Presentation of the 2005 Test: 2005 and 2006

F. Fire Performance Claims for New Technology K15

G. Class 0

H. The Fire Performance of New Technology K15

I. Testing in Accordance with BAS 476 Parts 6 and 7

J. Testing under BS 8414

K. The First BBA Certificate: October 2008

i. "Will not contribute to the development stages of a fire..."

ii. Class 0

iii. The BS 8414 Test in 2005

iv. "Advice should be sought from the certificate holder"

L. What the BBA did not Know

M. Amendments Proposed by the BBA: December 2008

N. Marketing and Challenges: 2008 - 2009

O. The LABC Certificate 2009

P. Amended BBA Certificates 2010 - 2013

Q. LABC, NHBC & Wintech: 2012 - 2013

R. BS 8414 Test: 2014

S. Conclusions


Don't forget to visit www.fireninja.info and subscribe to the newsletter for more big news.

Show more...
9 months ago
1 hour 59 minutes 10 seconds

Fire Ninja
Grenfell Phase 2 - Volume 2 - Part 3 - Chapter 21

This episode looks at Volume 2 Chapter 21 of the Grenfell Phase 2 Inquiry report speifically;


1. The Review of The Reynobond Certificate

A. The BBA's Review Processes: An Overview

B. The Agreement with CSTB

C. Review Project 2011

D. Arconic Reynobond PE Testing in 2011

E. Review Project: 2013-2015

F. Maria Barbeito's Attempts to Review the Certificate: October 2013 - September 2014

G. Valentina Amoroso's Review: September 2014 - January 2015

H. Arconic's Submissions on the Review

I. Reissue Contract 2015

J. Review Project 2016

K. Technical Reissue: 2016 - 2017

L. Reissue September 2017

M. The Discovery of Reynobond PE & FR Test Reports


Don't forget to visit www.fireninja.info and subscribe for behind the scenes content

Show more...
10 months ago
40 minutes 13 seconds

Fire Ninja
Grenfell Phase 2 - Volume 2 - Part 3 - Chapters 19 & 20

This episode looks at Volume 2 Chapters 19 and 20 of the Grenfell Phase 2 Inquiry report.


1. Chapter 19 - The BBA Certificate for Reynobond 55 PE

A. The Product

B. Behaviour in Relation to Fire

i) Section 6.1

ii) Sections 6.2 and 6.3: Class 0

C) The BBA's Evidence

D) Mr Wehrle's Statements

E) Section 6.3: The Unexposed Face of the Product

F) Section 6.4: Colour

G) Section 6.5: Resistance to Fire

2. Chapter 20 - Subsequent Testing & Marketing of Reynobond 55 PE

A. The Fred-Roderick Pohl Presentation: September 2007

B. Internal & External Communications: 2009 - 2010

C. Further Testing & Review

i) CSTB Testing: June 2010

ii) CSTB Testing of Reynobond 55 PE in Casette Form: 2011

D. The First BBA Review: February - July 2011

E. Concentrating on the UK Market: July 2011

F. The Tamwheel Tower Fire: November 2012

G. The Al Hafeet Fire & Monitoring of Projects

H. Supply by Arconic for use at Grenfell Tower

I. Further Testing & Classification: 2013 - 2014

J. Claude Wehrle's Message of 3 February 2014

K. The Lacrosse Fire: November 2014

L. The BBA Review: 2013 - 2015

M. Further Testing by CSTB: October - December 2014

N. Testing of Reynobond 55 PE with a Black Core: 2015

O. Arctics Involvement in the Supply of Reynobond 55 PE for use at Grenfell Tower: 2015

P. Arctics Reaction to Cladding Fires Overseas: 2015 - 2016

i) Fire at The King Fahd Medical Centre in Riyadh: October 2015

ii) The Address Dubai: 31 December 2015

iii) Place De Hagenau: January 2016


Don't forget to visit www.fireninja.info and subscribe for behind the scenes content

Show more...
10 months ago
1 hour 8 minutes 42 seconds

Fire Ninja
Grenfell Phase 2 - Volume 2 - Part 3 - Chapters 15, 16, 17 & 18

This episode looks at Volume 2 Chapters 15, 16, 17 and 18 of the Grenfell Phase 2 Inquiry report.


1. Part 3: The Testing & Marketing of Products

2. Chapter 15 - Introduction to Part 3

3. Chapter 16 - Arconic - Evidential Matters

A. The French Blocking Statute

B. The Gathering of Documents & Witness Statements

C. Gathering Evidence from Arconics Employees

4. Chapter 17 - Arconics Testing of ACM Panels 1997 - 2006

A. January 1997: Reynobond 160 PE

B. July 2006: Colin Southgate's Warnings

C. European Testing: 2004 - 2006

i) December 2004: Tests 5A & 5B

ii) Test 5A

iii) Test 5B

iv) 2003 - 2006 Tests on Reynobond 55 FR (Riveted Form)

5) Chapter 18 - Obtaining a BBA Certificate for Reynobond 55 PE

A. The Application to the BBA: August 2006

B. Negotiations Between Arconic & The BBA

C. Arconics Contract with the BBA: March 2007

D. Arconics Further Provision of test Data to the BBA: May - November 2007

E. Drafting & Issuing of the BBA Certificate: October 2007 - January 2008


Don't forget to visit www.fireninja.info and subscribe for behind the scenes content

Show more...
10 months ago
53 minutes 34 seconds

Fire Ninja
Grenfell Phase 2 - Volume 1 - Part 2 - Chapter 13 & Chapter 14

This episode looks at Volume 1 Chapters 13 & 14 of the Grenfell Phase 2 Inquiry report.


Chapter 13: The Fire Safety Order

Chapter 14: The Local Government Association Guide

Show more...
11 months ago
22 minutes 28 seconds

Fire Ninja
Grenfell Phase 2 - Volume 1 - Part 2 - Chapter 12

This episode looks at Volume 1 Chapter 12 of the Grenfell Phase 2 Inquiry report.


1. Regulation of Fire Risk Assessors


A. The Initial Evaluation of the Effectiveness of The Fire Safety Order (March 2009)

B. Sir Ken Knight's Report on the Fire at Lakanal House (July 2009)

C. London Assembly Report - Tall & Timber-Framed Buildings

D. The Government's Initial Response

E. Jayne Boys's Review

F. The Fire Risk Assessment Competency Council

G. The Competency Council Guides

H. The Lakanal House Inquests

I. The Persisting Problem

J. Further Proposals: 2016 Onwards


Don't forget to visit www.fireninja.info and subscribe for behind the scenes content

Show more...
11 months ago
35 minutes 30 seconds

Fire Ninja
Grenfell Phase 2 - Volume 1 - Part 2 - Chapter 11

This episode looks at Volume 1 Chapter 11 of the Grenfell Phase 2 Inquiry report.


1. Combustible Cladding: Warnings to Government

A. Introduction

B. 2012 - 2013: International Cladding Fires

C. November 2013 to January 2014: Questions From BRE

D. An FAQ?

E. More International Cladding Fires

F. February 2014: Wintech's Intervention

G. April 2014: Discussions with BRE

H. 2nd July 2014: The CWCT Meeting

I. Brian Martin's Reaction

J. Dr. Colwell & The FAQ

K. A Missed Opportunity to Clarify Approved Document B

L. The Confusion Between Class 0 & Limited Combustibility

M. 2nd July 2014: Brian Martin's Friendly Warning

N. NHBC's Response

O. The Department's Reaction

P. Contact with the BBA

Q. The Department's Omissions: K15

R. August 2014: BCA Technical Guidance Note 18

S. Option 1 & the 'Linear Route'

T. 21st February 2015: The Fire at the Torch

U. June 2015: NHBC's Question

V. January 2016: The Fire at the Address Downtown, Dubai

W. 16th February 2016: Correspondence with Booth Muirie Ltd.

X. Evidence & Statistics

Y. 24th February 2016: More Industry Concerns

Z. 17th March 2016: The Second Meeting of the CWTC

AA. 28th March 2016: The Fire at Ajman One, Dubai

AB. 7th July 2016: The NHBC's New Guidance


Don't forget to visit www.fireninja.info and subscribe for behind the scenes content

Show more...
11 months ago
1 hour 16 minutes 44 seconds

Fire Ninja
Grenfell Phase 2 - Volume 1 - Part 2 - Chapter 10

This episode looks at Volume 1 Chapter 10 of the Grenfell Phase 2 Inquiry report.


Specifically this episode examines;

1. The Department for Communities and Local Government: 2013-2017

A. Introduction

B. The Officials

C. The Ministers

D. De-Regulation

E. The Departments Response to the Coroners Rule 43 Letter

F. Submission to the Junior Minister

G. Submission to the Secretary of State

H. The Appointment of Stephen Williams as Parliamentary Under Secretary of State for Communities & Local Government & Richard Harral as Head of Technical Policy: 2013-2014

I. Lord Wharton Becomes a Junior Minister: May 2015

J. Merger of the Review of Approved Document B with the Review of Building Regulations Policy and Building Control: Summer 2015

K. The Effect of De-Regulation on Ministers & Officials

L. Ministerial Submission: November 2015

M. Further Delays in 2016

N. Lord Barwell becomes a Junior Minister: July 2016

O. Further Delay in the Publication of the Discussion Document

P. Other Work on Fire Safety

i) The Save Workstreams

ii) Research on the Spread of Fire over External Walls

iii) Usability Study

Q. Engagement with the All-Party Parliamentary Group on Fire Safety

R. The Management of the Department


Don't forget to visit www.fireninja.info and subscribe for behind the scenes content

Show more...
11 months ago
1 hour 23 minutes 15 seconds

Fire Ninja
Grenfell Phase 2 - Volume 1 - Part 2 - Chapter 9

This episode looks at Volume 1 Chapter 9 of the Grenfell Phase 2 Inquiry report.


Specifically this episode examines;

A. Investigations Immediately Following the Fire

B. Sir Ken Knight's Report to The Secretary of State

C. Further Testing by the LFB of the External Wall Panels

D. BRE's Investigation of Real Fires Report: November 2009

E. Failure to Learn Wider Lessons from the Lakanal House Fire

F. The Inquests into the Deaths at Lakanal House

G. Class 0 & Combustibility

H. Approved Document B

I. The Jury's Verdicts

J. The Coroner's Rule 43 Letter

K. Conclusions


Don't forget to visit www.fireninja.info and subscribe for behind the scenes content

Show more...
11 months ago
39 minutes 59 seconds

Fire Ninja
Grenfell Phase 2 - Volume 1 - Part 2 - Chapter 8

This episode looks at Volume 1 Chapter 8 of the Grenfell Phase 2 Inquiry report.


More specifically this episode examines;

1. The Investigation of Real Fires Project

A. Introduction

B. Background

C. The Operation of The Project

D. A Change in the Scope of the Project: October 2012

E. Findings in Reports

F. Sudbury House & Taplow House Fires: 2010-2012

G. Identification of Patterns & Trends

H. Concerns About Downward Fire Spread & Flaming Droplets

I. International Fires

J. Conclusions


Don't forget to visit www.fireninja.info and subscribe for behind the scenes content

Show more...
11 months ago
28 minutes 16 seconds

Fire Ninja
Grenfell Phase 2 - Volume 1 - Part 2 - Chapter 7.2

This episode looks at Volume 1 Chapter 7 of the Grenfell Phase 2 Inquiry report and is the second of 2 parts.


This episode examines the following;

1. The Government & The Building Research Establishment

L. Experimental Testing Programme

M. Products Sold As Class 0 Did Not Achieve Class 0

N. Aluminum Composite Panel with Polyethylene Cores

O. Harmonisation & RADAR 2

P. The RADAR Research

Q. Transposition

R. The Retention of Class 0

S. The Transitional Period

T. Equivalence & The Note in Diagram 40

U. The Development of the BS 8414 Test Series & The 2nd Edition of BR 135

i) BS 8414 Part 1:2002

ii) BR 135, 2nd Edition:2003

iii) BS 8414 Part 2:2005

iv) BR 135, 3rd Edition:2006

V. Approved Document B 2006

i) The Background to the Amendment

ii) The 2002 Edition

iii) The 2006 Edition

iv) The Origin & Evolution of the Amendments

v) The Response of NHBC to the Consultation

vi) The Course of the Amendments


Don't forget to visit www.fireninja.info and subscribe for behind the scenes content

Show more...
11 months ago
56 minutes 55 seconds

Fire Ninja
Grenfell Phase 2 - Volume 1 - Part 2 - Chapter 7.1

This episode looks at Volume 1 Chapter 7 of the Grenfell Phase 2 Inquiry report and is the first of 2 parts.


This episode examines the following;


1. The Government & The Building Research Establishment

A. Introduction

B. Knowsley Heights: 1991

C. 1994: Dr. Raymond Connolley's Ten Large-Scale Tests

D. 1996-1998: Fire Note 3

E. 1999: The Garnock Court Fire

F. Fire Note 9

G. 1999: Recommendations of the Parliamentary Select Committee

H. 2000: The Departments Response

I. 2000 - 2001: Review of BR 135

J. The Literature Review: 2000

K. The Survey


Don't forget to visit www.fireninja.info and subscribe for behind the scenes content

Show more...
11 months ago
1 hour 2 minutes 36 seconds

Fire Ninja
Grenfell Phase 2 - Volume 1 - Part 2 - Chapter 6

This episode looks at Volume 1 Chapter 6 of the Grenfell Phase 2 Inquiry report.


This episode examines the following;

1. Chapter 6 - Regulations & Guidance Relating to External Walls

A. Introduction

B. The London Building (Constructional) Bylaws

C. The 1965 Building Regulations

D. The Building Regulations 1972

E. The Building Regulations 1976

F. The Building Regulations 1985 & Approved Document B1985

G. The Building Regulations 1991

H. Approved Document B 1992

I. The Building Regulations (Amendment) No. 2 Regulations 1999

J. Building Regulations 2000 & Approved Document B 2000

K. Approved Document B 2000 with 2002 Amendments

L. Approved Document B 2006

M. Approved Document B 2007, 2010 &2013

N. Summary of the External Wall Requirement/Guidance Changes over Time


Don't forget to subscribe at www.fireninja.info for pictures from the report.

Show more...
11 months ago
27 minutes 30 seconds

Fire Ninja
Grenfell Phase 2 - Volume 1 - Part 2 - Chapter 5

This episode looks at Volume 1 Chapter 5of the Grenfell Phase 2 Inquiry report.


This episode examines the following;


1. Chapter 5 - Fire Testing

A. Introduction

B. National Reaction to Fire Tests

C. BS 476-4: Non-Combustible

D. BS 476-11: Method for Assessing Heat Emission

E. BS476-6: Method of Test for Fire Propagation of Products

F. BS 476-7: Surface Spread of Flame Test

G. Non-Combustible

H. Limited Combustibility

I. National Class 0

J. European Reaction to Fire Tests

K. BS EN ISO 1182: Non-Combustibility

L. BS EN ISO 1716: Gross Heat Combustion

M. BS EN 13823: Single Burning Item Test

N. BS EN ISO 11925-2: Single Flame Source Test

O. European Reaction to Fire Test Classification System

P. The European Classes Cited in Approved Document B

Q. Large Scale Testing to BS 8414 and Classification to BR 135


Don't forget to subscribe at www.fireninja.info for pictures from the report.

Show more...
11 months ago
49 minutes 18 seconds

Fire Ninja
Grenfell Phase 2 - Volume 1 - Part 2 - Chapter 3 & 4

This episode looks at Volume 1 Chapter 3 & 4 of the Grenfell Phase 2 Inquiry report.


This episode examines the following;


1. Chapter 3 - An Introduction to Part 2

2. Chapter 4 - The Development of the Regulatory Regime

A. Terminology

B. Local Acts & Byelaws: Prescriptive Building Regulation

C. Creation of the First Testing Standard for Building Construction

D. State-Sponsored Fire Research Organisation

E. The Move Towards Functional Requirements

F. The Building Regulations 1965

G. The Agrement Board (Later The British Board of Agrement (BBA))

H. Dissatisfaction

I. The Holyroyd Report

J. Move to Funtionality-Based Building Regulations

K. The Building Act 1984, The Building Regulations 1985 & The Approved Documents

L. The Building Regulations Applied to London

M. The Building Regulations 1991

N. The Building Regulations 2000

O. The Building Regulations 2010

Show more...
11 months ago
33 minutes 29 seconds

Fire Ninja
An explanation of fire safety law, tips, guidance and advice to keep you safe from fire and prosecution