The Future of Building is Here – and it Starts with People. In this episode, we sat down with Kirk Offel, CEO of Overwatch Mission Critical and founder of DCAC, to talk about the explosive growth of the data center industry and the workforce needed to power it. Kirk shares how his journey from U.S. Navy submariner to tech entrepreneur shaped his leadership philosophy and why he believes this is the best time in history to become a builder. From veterans finding purpose to AI reshaping how w...
All content for Work Done Right™ is the property of Cumulus Digital Systems and is served directly from their servers
with no modification, redirects, or rehosting. The podcast is not affiliated with or endorsed by Podjoint in any way.
The Future of Building is Here – and it Starts with People. In this episode, we sat down with Kirk Offel, CEO of Overwatch Mission Critical and founder of DCAC, to talk about the explosive growth of the data center industry and the workforce needed to power it. Kirk shares how his journey from U.S. Navy submariner to tech entrepreneur shaped his leadership philosophy and why he believes this is the best time in history to become a builder. From veterans finding purpose to AI reshaping how w...
Data Center Construction and the Shift Towards Modular Builds with Luke Kipfer
Work Done Right™
42 minutes
2 years ago
Data Center Construction and the Shift Towards Modular Builds with Luke Kipfer
Luke Kipfer joins the Work Done Right podcast this week to delve into the dynamic world of data center construction. One prominent theme highlighted was the industry's significant shift towards modular construction methods. Recognized for their speed, cost-efficiency, quality control, and safety enhancements compared to traditional stick-built approaches, modular designs are gaining traction, largely fueled by standardization, enabling the efficient deployment of infrastructure across diverse...
Work Done Right™
The Future of Building is Here – and it Starts with People. In this episode, we sat down with Kirk Offel, CEO of Overwatch Mission Critical and founder of DCAC, to talk about the explosive growth of the data center industry and the workforce needed to power it. Kirk shares how his journey from U.S. Navy submariner to tech entrepreneur shaped his leadership philosophy and why he believes this is the best time in history to become a builder. From veterans finding purpose to AI reshaping how w...