The permitting process for carbon-capture projects is, in some ways, like navigating Houston’s notorious rush-hour traffic — if everyone tries to move at once, gridlock can quickly ensue. That’s true at both the federal level, where the EPA has more sequestration wells under review than ever before, and at the state level, where Louisiana just hit the pause button on its reviews. In today’s RBN blog, we look at how increased interest in carbon capture has exacerbated the permitting backlog.
All content for RBN Energy Blogcast is the property of RBN Energy and is served directly from their servers
with no modification, redirects, or rehosting. The podcast is not affiliated with or endorsed by Podjoint in any way.
The permitting process for carbon-capture projects is, in some ways, like navigating Houston’s notorious rush-hour traffic — if everyone tries to move at once, gridlock can quickly ensue. That’s true at both the federal level, where the EPA has more sequestration wells under review than ever before, and at the state level, where Louisiana just hit the pause button on its reviews. In today’s RBN blog, we look at how increased interest in carbon capture has exacerbated the permitting backlog.
You Need to Calm Down – Increasing Texas/Louisiana Production to Feed Ever-Growing List of LNG Plants
RBN Energy Blogcast
12 minutes 49 seconds
3 weeks ago
You Need to Calm Down – Increasing Texas/Louisiana Production to Feed Ever-Growing List of LNG Plants
Several large-scale LNG export projects have reached a final investment decision this year along the U.S. Gulf Coast, with most expected to start up between 2029 and 2031. They will be supported by new pipeline capacity to deliver natural gas from producing areas, but how and where will production increase to meet this new demand? In today’s RBN blog, we detail the movement of gas throughout Texas and Louisiana and highlight the key findings in the newest edition of our Arrow Model.
RBN Energy Blogcast
The permitting process for carbon-capture projects is, in some ways, like navigating Houston’s notorious rush-hour traffic — if everyone tries to move at once, gridlock can quickly ensue. That’s true at both the federal level, where the EPA has more sequestration wells under review than ever before, and at the state level, where Louisiana just hit the pause button on its reviews. In today’s RBN blog, we look at how increased interest in carbon capture has exacerbated the permitting backlog.