The permitting process for carbon-capture projects is, in some ways, like navigating Houston’s notorious rush-hour traffic — if everyone tries to move at once, gridlock can quickly ensue. That’s true at both the federal level, where the EPA has more sequestration wells under review than ever before, and at the state level, where Louisiana just hit the pause button on its reviews. In today’s RBN blog, we look at how increased interest in carbon capture has exacerbated the permitting backlog.
All content for RBN Energy Blogcast is the property of RBN Energy and is served directly from their servers
with no modification, redirects, or rehosting. The podcast is not affiliated with or endorsed by Podjoint in any way.
The permitting process for carbon-capture projects is, in some ways, like navigating Houston’s notorious rush-hour traffic — if everyone tries to move at once, gridlock can quickly ensue. That’s true at both the federal level, where the EPA has more sequestration wells under review than ever before, and at the state level, where Louisiana just hit the pause button on its reviews. In today’s RBN blog, we look at how increased interest in carbon capture has exacerbated the permitting backlog.
Rock and Roll All Nite, Part 2 – Still More Gulf Coast Natural Gas Storage Capacity Is on the Way
RBN Energy Blogcast
15 minutes 42 seconds
3 weeks ago
Rock and Roll All Nite, Part 2 – Still More Gulf Coast Natural Gas Storage Capacity Is on the Way
Keeping up with all the natural-gas-related infrastructure under development along the Gulf Coast is a full-time job. New gas pipelines out of the Permian and the Haynesville. New LNG export terminals from Brownsville, TX, to Plaquemines Parish, LA. And don’t forget new gas storage capacity — that slice of the midstream sector is in the midst of its biggest boom in decades. In today’s RBN blog, we’ll finish our review of the latest round of Gulf Coast storage projects.
RBN Energy Blogcast
The permitting process for carbon-capture projects is, in some ways, like navigating Houston’s notorious rush-hour traffic — if everyone tries to move at once, gridlock can quickly ensue. That’s true at both the federal level, where the EPA has more sequestration wells under review than ever before, and at the state level, where Louisiana just hit the pause button on its reviews. In today’s RBN blog, we look at how increased interest in carbon capture has exacerbated the permitting backlog.