The permitting process for carbon-capture projects is, in some ways, like navigating Houston’s notorious rush-hour traffic — if everyone tries to move at once, gridlock can quickly ensue. That’s true at both the federal level, where the EPA has more sequestration wells under review than ever before, and at the state level, where Louisiana just hit the pause button on its reviews. In today’s RBN blog, we look at how increased interest in carbon capture has exacerbated the permitting backlog.
All content for RBN Energy Blogcast is the property of RBN Energy and is served directly from their servers
with no modification, redirects, or rehosting. The podcast is not affiliated with or endorsed by Podjoint in any way.
The permitting process for carbon-capture projects is, in some ways, like navigating Houston’s notorious rush-hour traffic — if everyone tries to move at once, gridlock can quickly ensue. That’s true at both the federal level, where the EPA has more sequestration wells under review than ever before, and at the state level, where Louisiana just hit the pause button on its reviews. In today’s RBN blog, we look at how increased interest in carbon capture has exacerbated the permitting backlog.
Rock and Roll All Nite – The Gulf Coast’s Natural Gas Storage Buildout Party Continues
RBN Energy Blogcast
12 minutes 19 seconds
3 weeks ago
Rock and Roll All Nite – The Gulf Coast’s Natural Gas Storage Buildout Party Continues
A tsunami of natural gas storage projects has been building along the Gulf Coast, most of them aimed at meeting the growing demand for flexible, responsive storage capacity near new LNG export terminals and gas-fired power plants. And the magnitude of that wave keeps growing. In today’s RBN blog, we’ll begin a new mini-series in which we update the storage projects we discussed in a number of posts last year and describe the additional projects that have come to light since then.
RBN Energy Blogcast
The permitting process for carbon-capture projects is, in some ways, like navigating Houston’s notorious rush-hour traffic — if everyone tries to move at once, gridlock can quickly ensue. That’s true at both the federal level, where the EPA has more sequestration wells under review than ever before, and at the state level, where Louisiana just hit the pause button on its reviews. In today’s RBN blog, we look at how increased interest in carbon capture has exacerbated the permitting backlog.