The permitting process for carbon-capture projects is, in some ways, like navigating Houston’s notorious rush-hour traffic — if everyone tries to move at once, gridlock can quickly ensue. That’s true at both the federal level, where the EPA has more sequestration wells under review than ever before, and at the state level, where Louisiana just hit the pause button on its reviews. In today’s RBN blog, we look at how increased interest in carbon capture has exacerbated the permitting backlog.
All content for RBN Energy Blogcast is the property of RBN Energy and is served directly from their servers
with no modification, redirects, or rehosting. The podcast is not affiliated with or endorsed by Podjoint in any way.
The permitting process for carbon-capture projects is, in some ways, like navigating Houston’s notorious rush-hour traffic — if everyone tries to move at once, gridlock can quickly ensue. That’s true at both the federal level, where the EPA has more sequestration wells under review than ever before, and at the state level, where Louisiana just hit the pause button on its reviews. In today’s RBN blog, we look at how increased interest in carbon capture has exacerbated the permitting backlog.
Every Rose Has Its Thorn – Poor Performance in the Petrochemical Industry Affecting Earnings
RBN Energy Blogcast
10 minutes 39 seconds
3 days ago
Every Rose Has Its Thorn – Poor Performance in the Petrochemical Industry Affecting Earnings
The global petrochemical is currently experiencing a downturn, and this is showing up in earnings. These companies are reacting with cost reductions and capacity rationalizations.
RBN Energy Blogcast
The permitting process for carbon-capture projects is, in some ways, like navigating Houston’s notorious rush-hour traffic — if everyone tries to move at once, gridlock can quickly ensue. That’s true at both the federal level, where the EPA has more sequestration wells under review than ever before, and at the state level, where Louisiana just hit the pause button on its reviews. In today’s RBN blog, we look at how increased interest in carbon capture has exacerbated the permitting backlog.