The permitting process for carbon-capture projects is, in some ways, like navigating Houston’s notorious rush-hour traffic — if everyone tries to move at once, gridlock can quickly ensue. That’s true at both the federal level, where the EPA has more sequestration wells under review than ever before, and at the state level, where Louisiana just hit the pause button on its reviews. In today’s RBN blog, we look at how increased interest in carbon capture has exacerbated the permitting backlog.
All content for RBN Energy Blogcast is the property of RBN Energy and is served directly from their servers
with no modification, redirects, or rehosting. The podcast is not affiliated with or endorsed by Podjoint in any way.
The permitting process for carbon-capture projects is, in some ways, like navigating Houston’s notorious rush-hour traffic — if everyone tries to move at once, gridlock can quickly ensue. That’s true at both the federal level, where the EPA has more sequestration wells under review than ever before, and at the state level, where Louisiana just hit the pause button on its reviews. In today’s RBN blog, we look at how increased interest in carbon capture has exacerbated the permitting backlog.
All We Are Saying ... Is Give (NESE) a Chance – Can Williams Finally Build Its New York City Pipeline?
RBN Energy Blogcast
11 minutes 53 seconds
2 weeks ago
All We Are Saying ... Is Give (NESE) a Chance – Can Williams Finally Build Its New York City Pipeline?
This past spring — 10 years after Williams Cos. first proposed the Northeast Supply Enhancement Project and one year after it scrapped plans for it — the effort to add 400 MMcf/d of natural gas pipeline capacity into New York City was revived. Since then, FERC has re-approved the project and regulators in New York and New Jersey have been mulling over whether to issue water-quality permits. In today’s RBN blog, we discuss Williams’s renewed push to get NESE permitted and built.
RBN Energy Blogcast
The permitting process for carbon-capture projects is, in some ways, like navigating Houston’s notorious rush-hour traffic — if everyone tries to move at once, gridlock can quickly ensue. That’s true at both the federal level, where the EPA has more sequestration wells under review than ever before, and at the state level, where Louisiana just hit the pause button on its reviews. In today’s RBN blog, we look at how increased interest in carbon capture has exacerbated the permitting backlog.