TeraWulf’s CFO Patrick Fleury walks through a new Google-backed FluidStack JV, why SPP beats ERCOT for timelines, and how a rated, callable debt structure unlocks scale. We compare co-location to GPUaaS, unpack NOI math, and outline a repeatable playbook for AI-ready, water-cooled data centers. • Google-supported FluidStack JV structure and equity split • Rationale for SPP over ERCOT and interconnect realities • Standardized high-density, water-cooled design and PUE nuance • Co-location econ...
All content for Power Mining Analysis is the property of Anthony Power & Bryce McNallie and is served directly from their servers
with no modification, redirects, or rehosting. The podcast is not affiliated with or endorsed by Podjoint in any way.
TeraWulf’s CFO Patrick Fleury walks through a new Google-backed FluidStack JV, why SPP beats ERCOT for timelines, and how a rated, callable debt structure unlocks scale. We compare co-location to GPUaaS, unpack NOI math, and outline a repeatable playbook for AI-ready, water-cooled data centers. • Google-supported FluidStack JV structure and equity split • Rationale for SPP over ERCOT and interconnect realities • Standardized high-density, water-cooled design and PUE nuance • Co-location econ...
Riot Platforms CEO Jason Les Q&A - Q3 Earnings & Data Center Expansion!
Power Mining Analysis
1 hour
5 days ago
Riot Platforms CEO Jason Les Q&A - Q3 Earnings & Data Center Expansion!
We break down Riot’s record Q3 and the strategy shift that turns low-cost power into high-value data centers. Jason Les explains how Corsicana scales to one gigawatt, why Rockdale stays productive, and how mining funds and balances the move into AI-grade colocation. • record revenue and margin drivers across mining and engineering • rising network difficulty versus low all-in power cost • the case for data centers as the highest return use of power • Rockdale’s bridge role and planned hash r...
Power Mining Analysis
TeraWulf’s CFO Patrick Fleury walks through a new Google-backed FluidStack JV, why SPP beats ERCOT for timelines, and how a rated, callable debt structure unlocks scale. We compare co-location to GPUaaS, unpack NOI math, and outline a repeatable playbook for AI-ready, water-cooled data centers. • Google-supported FluidStack JV structure and equity split • Rationale for SPP over ERCOT and interconnect realities • Standardized high-density, water-cooled design and PUE nuance • Co-location econ...