TeraWulf’s CFO Patrick Fleury walks through a new Google-backed FluidStack JV, why SPP beats ERCOT for timelines, and how a rated, callable debt structure unlocks scale. We compare co-location to GPUaaS, unpack NOI math, and outline a repeatable playbook for AI-ready, water-cooled data centers. • Google-supported FluidStack JV structure and equity split • Rationale for SPP over ERCOT and interconnect realities • Standardized high-density, water-cooled design and PUE nuance • Co-location econ...
All content for Power Mining Analysis is the property of Anthony Power & Bryce McNallie and is served directly from their servers
with no modification, redirects, or rehosting. The podcast is not affiliated with or endorsed by Podjoint in any way.
TeraWulf’s CFO Patrick Fleury walks through a new Google-backed FluidStack JV, why SPP beats ERCOT for timelines, and how a rated, callable debt structure unlocks scale. We compare co-location to GPUaaS, unpack NOI math, and outline a repeatable playbook for AI-ready, water-cooled data centers. • Google-supported FluidStack JV structure and equity split • Rationale for SPP over ERCOT and interconnect realities • Standardized high-density, water-cooled design and PUE nuance • Co-location econ...
AI Power & Land Grab: Latest Miner News & Price Targets (WULF, HUT & CORZ)
Power Mining Analysis
29 minutes
1 week ago
AI Power & Land Grab: Latest Miner News & Price Targets (WULF, HUT & CORZ)
We explore why power scarcity now drives the mining sector’s strategy, how AI demand is reshaping business models, and what TerraWolf’s Google-backed JV signals for valuation. Analyst upgrades, Core Scientific’s vote dynamics, and our Texas site tour round out a fast-moving day. • bitcoin price holding near highs and hash economics improving • power scarcity as the core bottleneck for AI and mining • global data center energy demand set to double by 2030 • nuclear timelines versus near-term ...
Power Mining Analysis
TeraWulf’s CFO Patrick Fleury walks through a new Google-backed FluidStack JV, why SPP beats ERCOT for timelines, and how a rated, callable debt structure unlocks scale. We compare co-location to GPUaaS, unpack NOI math, and outline a repeatable playbook for AI-ready, water-cooled data centers. • Google-supported FluidStack JV structure and equity split • Rationale for SPP over ERCOT and interconnect realities • Standardized high-density, water-cooled design and PUE nuance • Co-location econ...