Home
Categories
EXPLORE
True Crime
Comedy
Society & Culture
Business
Sports
Technology
Health & Fitness
About Us
Contact Us
Copyright
© 2024 PodJoint
Podjoint Logo
US
00:00 / 00:00
Sign in

or

Don't have an account?
Sign up
Forgot password
https://is1-ssl.mzstatic.com/image/thumb/Podcasts124/v4/e2/7a/35/e27a35de-95fd-2d19-a5ba-a75a954cffd7/mza_3814169088479576574.jpg/600x600bb.jpg
Energy 360 by EnerCom
EnerCom Inc. | Oil and Gas 360
69 episodes
5 months ago
Expert interviews with today's top oil and gas executives, hosted by the team at EnerCom, Inc
Show more...
Investing
Business,
Marketing
RSS
All content for Energy 360 by EnerCom is the property of EnerCom Inc. | Oil and Gas 360 and is served directly from their servers with no modification, redirects, or rehosting. The podcast is not affiliated with or endorsed by Podjoint in any way.
Expert interviews with today's top oil and gas executives, hosted by the team at EnerCom, Inc
Show more...
Investing
Business,
Marketing
https://is1-ssl.mzstatic.com/image/thumb/Podcasts124/v4/e2/7a/35/e27a35de-95fd-2d19-a5ba-a75a954cffd7/mza_3814169088479576574.jpg/600x600bb.jpg
Pure Gas Play: A Conversation with Rob McBride at Enverus
Energy 360 by EnerCom
22 minutes 29 seconds
5 years ago
Pure Gas Play: A Conversation with Rob McBride at Enverus
As we went through our interview covering  "Hanesville and Appalachain - Gas Focus" (https://www.enverus.com/upstream-fundamentaledge-report-preview-september-2020/) with Rob McBride, Sr. Director, Enverus, the numbers confirmed that pure gas plays are set to rise. Appalachian – Marcellus and Utica ➢ Rigs have fallen off in the Appalachian, but there are still rigs running and new wells being drilled. Production is expected to continue to climb in the Marcellus and Utica. The Mountain Valley Pipeline (MVP) is expected to come online in early 2021, which will add 2 Bcf/d of takeaway capacity to the region and send gas to the Transco Zone 5 region. Should MVP meet the same fate as the Atlantic Coast Pipeline, which was cancelled in early July, pipeline bottlenecks could be seen in the region as early as mid-2021. Enverus does not expect this to happen. Haynesville: ➢ With the drop in crude oil prices, higher natural gas prices are needed to make pure gas plays economical. Higher gas-directed production will offset the production losses from associated gas in order to meet demand in the US. As production grows, additional takeaway capacity is needed from the play. At least four pipeline projects have been proposed to transport gas from the Haynesville to demand in the Gulf Coast. Rob, thanks for stopping by and visiting with us about your team's newest report! Check the link below to download the report, or contact Rob.
Energy 360 by EnerCom
Expert interviews with today's top oil and gas executives, hosted by the team at EnerCom, Inc