Delay Analysis - ConstructionCast S1 Ep11 In this episode of ConstructionCast, Stuart was joined by Tom Francis (Decipher), Michelle Metz (HKA) and David Stone (FieldStone DA).
All content for Construction Cast is the property of Limeslade and is served directly from their servers
with no modification, redirects, or rehosting. The podcast is not affiliated with or endorsed by Podjoint in any way.
Delay Analysis - ConstructionCast S1 Ep11 In this episode of ConstructionCast, Stuart was joined by Tom Francis (Decipher), Michelle Metz (HKA) and David Stone (FieldStone DA).
Delay Analysis - ConstructionCast S1 Ep11 In this episode of ConstructionCast, Stuart was joined by Tom Francis (Decipher), Michelle Metz (HKA) and David Stone (FieldStone DA).
Construction Cast
Delay Analysis - ConstructionCast S1 Ep11 In this episode of ConstructionCast, Stuart was joined by Tom Francis (Decipher), Michelle Metz (HKA) and David Stone (FieldStone DA).